Application engineering note

Buckets and attachments

Map material flow, impact zones and the repair route before selecting hardness class and plate layout.

GX-AE-A01-0.9Indicative
Concept view of a worn excavator bucket with replaceable blue-black liners and a prepared cutting edge in a workshop.
AI-generated concept visual — not evidence of stock, a customer project or operations.
01 / Wear field

Dominant wear mechanisms

Indicative guidance. Actual plate layout, class and inspection plan are determined per order.

Indicative
  • 01Sliding abrasion
  • 02Gouging abrasion
  • 03Local impact loading
02 / Component map

Components and high-wear zones

  • 01Shell sides and floors
  • 02Liners and wear strips
  • 03Side cutters and exposed zones
03 / Selection gate

Questions before grade selection

  • 01Is the material rock, soil or a mixture?
  • 02Where and how severe is impact?
  • 03How long and intense is the duty cycle?
  • 04Which geometry must be bent or welded?
  • 05How will wear parts be accessed and repaired?
Related grades to evaluateIndicativeUnits: Nominal HBW · Source: Application engineering note · Revision: GX-AE-A01-0.9
Nominal classDecision basis
GOREX 400Is the material rock, soil or a mixture? · Where and how severe is impact? · How long and intense is the duty cycle? · Which geometry must be bent or welded? · How will wear parts be accessed and repaired?
GOREX 450Is the material rock, soil or a mixture? · Where and how severe is impact? · How long and intense is the duty cycle? · Which geometry must be bent or welded? · How will wear parts be accessed and repaired?
GOREX 500Is the material rock, soil or a mixture? · Where and how severe is impact? · How long and intense is the duty cycle? · Which geometry must be bent or welded? · How will wear parts be accessed and repaired?
04 / Fabrication

Design and fabrication

Indicative
  • 01Segment wear plate so heat exposure and future replacement can be controlled.
  • 02Base the WPS and any preheat on actual chemistry and combined thickness.
05 / Inspection

Inspection and replacement planning

Indicative
  • 01Record starting thickness and fixed measurement points in principal wear zones.
  • 02Plan replacement against remaining thickness, cracking and attachment condition.
06 / Quote input

Bring operating data into the quotation

Describe material, impact, geometry, duty cycle, planned processing and requested inspection scope. The form is prefilled with this application category.